Advance Plus Pipework
IEIS provided a comprehensive & professional service at Windermere WwTW and were instrumental in designing, manufacturing, delivering & installing some substantial & at times challenging Advance Plus Pipework plus associated infrastructure for the main inlet, grit & screens area for the Windermere wastewater treatment plant.
Due to project timing constraints, IEIS mobilised without delay and were attentive from the on‐set, temporary piping systems for static loads were required early to ensure the installation program impact was minimised, these would need to be re‐visited later in order to factor in dynamic loads, all in the interest of safety and always with a positive outlook.
The professionalism, positivity, upbeat personalities & engaging style enable the IEIS teams to interact safely & effectively at all levels, they were always well organised & disciplined, QA was neat & business-like, providing the safety & quality required to ensure the correct outcome was realised.
On Windermere IEIS always took the initiative, would go beyond expected job scope parameters with safety leading the way ensuring all the intangibles that lead to a positive and successful installation were in order.





